Archiviert
Khujand Public Transport Project - Integrated Urban Mobility Concept
05.09.2022
Datum Publikation
26.09.2022
Anmeldung
Bauaufgabe
The main objectives of the assignment are (i) to introduce the integrated urban planning approach to the City and (ii) to demonstrate the impact of the integrated approach through implementation of measures. This would ensure effective utilization of the available infrastructure (transport, water, solid waste, etc.).
Source of supply for the documentation:
Procurement Operations and Delivery Department
Rachel Fitzjohn, Principal
One Exchange Square
GB EC2A 2JN London
E-mail : Fitzjohr@ebrd.com
Eckdaten
Ort
Khujand
Sprache
Deutsch
anonymes Verfahren
ja
Art des Verfahrens
selektives Verfahren
Quelle des Ausschreibungstextes
simap.ch