Zurück

Archiviert

Khujand Public Transport Project - Integrated Urban Mobility Concept

05.09.2022

Datum Publikation

26.09.2022

Anmeldung

Bauaufgabe

The main objectives of the assignment are (i) to introduce the integrated urban planning approach to the City and (ii) to demonstrate the impact of the integrated approach through implementation of measures. This would ensure effective utilization of the available infrastructure (transport, water, solid waste, etc.). Source of supply for the documentation: Procurement Operations and Delivery Department Rachel Fitzjohn, Principal One Exchange Square GB EC2A 2JN London E-mail : Fitzjohr@ebrd.com

Eckdaten

Ort

Khujand

Sprache

Deutsch

anonymes Verfahren

ja

Art des Verfahrens

selektives Verfahren

Quelle des Ausschreibungstextes

simap.ch