Zurück

Archiviert

Jizhou High-speed Railway

Ideenstudie

24.10.2018

Datum Publikation

28.10.2018

Anmeldung

Jizhou High-speed Railway

Bauaufgabe

Space Planning and Design Team The team shall have the expertise in the following aspects, namely regional development background and policy researches, site condition analysis, international case study and summary, forward-looking overall regional development positioning and strategy making, regional image positioning, land use layout and spatial design. Industry Planning Team The team shall have the expertise in the following aspects, namely analysis and assessment of existing industries in the region and the peripheral areas, studies on macro background and industrial development conditions, analysis of existing demographic structure and future population introduction, making of population introduction strategy, overall industry positioning and strategy making, products planning, operation model planning, investment and revenue evaluation.

Eckdaten

Ort

Jizhou

Auslober*in

People’s Government of Jizhou District

Bauherrschaft

People’s Government of Jizhou District

Verfahrensbegleitendes Büro

Syndicate CBC (China Building Centre) | Urban Enviroment Design (UED) Magazine

Art der Aufgabe

Neubau

Beschaffungsform

Ideenstudie

Sprache

Deutsch

anonymes Verfahren

Nein

Art des Verfahrens

selektives Verfahren

Resultat

Weiterempfohlen

Team

China Academy of Urban Planning & Design + Ernst & Young Global Limited (China)

Raumplanung

China Academy of Urban Planning & Design

Weiterempfohlen

Team

HHDesign + Shenzhen Yonghe Tianyuan Tourism Planning Limited

Raumplanung

HHDesign

Weiterempfohlen

Team

AECOM (Beijing) + Beijing Municipal Engineering Consulting Corporation

Raumplanung

AECOM (Beijing)

Weiterempfohlen

Team

Spark Architects + Colliers International

Raumplanung

Spark Architects