Zurück

Archiviert

Jaipur Metro (Phase II)

Projektwettbewerb

22.06.2016

Datum Publikation

Jaipur Metro (Phase II)

Bauaufgabe

THE JAIPUR METRO RAIL PROJECT The project is planned along two corridors. The East-West Corridor and the North-South Corridor. The East-West Corridor from Mansarovar to Badi Chaupar, with a total length of 12.067 Kms. is being executed as phase-I of the project. The North-South Corridor from Ambabari to Sitapura with a total length of 23.099 Kms. Shall be taken up as phase-II of the project.

Eckdaten

Ort

Jaipur

Auslober*in

Jaipur Metro Rail Corporation Ltd.

Art der Aufgabe

Neubau

Beschaffungsform

Projektwettbewerb

Sprache

Deutsch

anonymes Verfahren

Nein

Regionale Einschränkung

Internationaler Wettbewerb

Quelle des Ausschreibungstextes

https://jaipurmetrorail.in/Current%20Tenders